{"id":145,"date":"2026-09-21T10:00:00","date_gmt":"2026-09-21T07:00:00","guid":{"rendered":"https:\/\/mavix.ee\/tfs-solutions\/shelter-plan-deadline-1-july-2027\/"},"modified":"2026-11-13T13:08:31","modified_gmt":"2026-11-13T11:08:31","slug":"shelter-plan-deadline-1-july-2027","status":"publish","type":"post","link":"https:\/\/mavix.ee\/tfs-solutions\/en\/shelter-plan-deadline-1-july-2027\/","title":{"rendered":"A new requirement for buildings \u2013 the shelter plan must be ready by 1 July 2027"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Does your building know where people will take shelter in the event of an immediate threat?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In the event of an air raid, an explosion hazard or another immediate threat, there is no time to start deciding where to go and how to act only then.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A shelter plan sets this out for each building:<\/strong> where people can take shelter, how they get there, who is responsible for what and what must be done in the event of a threat. According to the Estonian Rescue Board, the plan must include the general arrangements for sheltering, the location of the shelter and a movement diagram, and the actions needed to bring it into readiness.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who must have a shelter plan?<\/h2>\n\n\n\n<p class=\"has-background wp-block-paragraph\" style=\"border-radius:12px;border-left-color:#E8501A;border-left-width:4px;border-left-style:solid;background-color:#FFF1EA;padding:18px 22px\">A shelter plan is generally required for buildings with an enclosed net area of at least <strong>1200 m\u00b2<\/strong>, or at least <strong>1500 m\u00b2<\/strong> for industrial buildings, where the building&#8217;s intended use falls under Annex 1 to Regulation No 50. For existing buildings that meet the requirements, the plan must be prepared <strong>no later than 1 July 2027<\/strong>. The building owner is responsible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What does TFS Solutions do?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">TFS Solutions prepares a <strong>shelter plan for your specific building<\/strong>. As part of the service, we assess the building&#8217;s shelter options and map suitable shelter locations; determine the shelter arrangements, movement and responsible persons; prepare the necessary diagrams; describe the actions for bringing the shelter location into readiness; and prepare clear instructions for the building&#8217;s users.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the building, the instructions also cover air raid warnings, the <strong>\u201cTAKE COVER NOW!\u201d<\/strong> order, what to do on spotting a suspicious drone, important information channels and action in the event of an immediate threat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is a shelter location?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A shelter location is a place adapted within an existing building, or as part of it, where people can take shelter in the event of a threat. <strong>A shelter location and a shelter plan are not the same thing:<\/strong> a shelter location is a physical place, while a shelter plan describes the sheltering arrangements for the whole building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In existing buildings that meet the requirements, the shelter location must be adapted where possible by <strong>1 July 2028<\/strong>, but the shelter plan must be ready a year earlier.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the event of an air raid, an explosion hazard or another immediate threat, there is no time to start deciding where to go and how to act only then.<\/p>\n","protected":false},"author":1,"featured_media":30,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shelter-en"],"_links":{"self":[{"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/posts\/145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/comments?post=145"}],"version-history":[{"count":1,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/posts\/145\/revisions"}],"predecessor-version":[{"id":664,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/posts\/145\/revisions\/664"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/media\/30"}],"wp:attachment":[{"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/media?parent=145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/categories?post=145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mavix.ee\/tfs-solutions\/wp-json\/wp\/v2\/tags?post=145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}